Movie Description
The Old Gotthard Tunnel Route - Driver's Eye View
(2018)Overview
The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…
Featured Crew
- Producer : Peter Middleton
- Writer : Peter Middleton
- Cast : Jonathan Kydd
Cast
Narrator
Recommendations
Directed by John Ford
6.927
The Class of ‘92
7.1
Night Will Fall
7.598
And the Oscar Goes To...
6.842
Gilbert
6.721
My Mom Jayne
8.01
Heart of a Dog
6.5
Public Speaking
6.975
Downloaded
6.495
Transcendent Man
6.7
A Plastic Ocean
7.54
Facts
Original TitleThe Old Gotthard Tunnel Route - Driver's Eye View
Status Released
Release Information
-
2018-10-01
Original LanguageEnglish
Runtime 01h 52m
Homepagehttps://www.video125.com/collections/new/products/the-old-gotthard-tunnel-route
Production CompaniesVideo 125
Genres
- Documentary






















